Refrigeration Pipe Work Installation of the interconnecting refrigeration pipe work between the Air Handling Unit and Air Conditioning Unit would be completed using our qualified engineers fitting refrigeration quality copper tubing, fittings and all good refrigeration practices. After installation the pipe work would be evacuated, pressure and leak tested, charged with R410a refrigerant and commissioned. All of this work would be carried out after the equipment has been positioned on site as part of our Plant Movement service; however it may be carried out at our factory if the equipment is being supplied and delivered on a single piece base frame
Our installation engineers are renowned for their thoroughness and straightforward approach. Our goal is to ensure that you avoid disruption and that works are finished to your complete satisfaction. Part of that approach is making sure that you are fully conversant with your system and how it will provide you with effective climate control and controlled energy costs.
We are extremely proud of our Aftersales Care service and our team for the outstanding work they do to help our customers. Please contact us for any help and assistance